Representative Work:

West Glacier Estates Planned Unit Development (PUD) Permit (2006)
Prepare successful application, represent land partnership and complete process to obtain City and Borough of Juneau preliminary plan and subdivision approval for West Glacier Estates72-unit residential development.

Subport Area Revitalization Plan (2003)
Create economically viable and redevelopment strategies for a 23 acre parcel of downtown Juneau waterfront.  Work with the Alaska Mental Health Land Trust Office landowner and neighboring “cooperators”/property owners, including the USCG, NOAA, National Guard, State of Alaska Dept. of Administration, Goldbelt Corporation, Alaska Land and Pier Company, and the City and Borough of Juneau.  Project products include a property inventory, identification of development assets and constraints, criteria to review redevelopment options, and two economically viable redevelopment schemes (including drawings).  Sheinberg reached out to a very broad set of interests and views when developing the Plan to help ensure that it brought landowners and the broader community together to “rally” around a mutually acceptable concept. Phase II was a public involvement process culminating incorporation into the Juneau Waterfront Plan, paving the way for capital improvement project funding, permitting, and private sector development.

West Douglas Island Conceptual Plan (1997)
Future waterfront growth in Juneau is anticipated for West Douglas Island, a beautifully situated deep-water shoreline ten miles from downtown Juneau.  Sheinberg Associates (as planning consultant to MRV Architects) helped craft the West Douglas Conceptual Plan in 1997.  Prepared for Goldbelt Inc. and the City and Borough of Juneau, the conceptual plan provides a land use and economic analysis and development recommendations for the 5,100 acres of property along an eight-mile shoreline.  The West Douglas master plan uses “smart-growth” concepts to recommend clustered development “nodes” that mix development with retention of natural environment and values.

Switzer Creek Area Master Plan (1997)
Subcontract to R&M Engineering on CBJ project to evaluate development potential and feasibility for 750 acre parcel of undeveloped land near Switzer Creek, Juneau.  Prepare Master Development Plan with land use recommendations.

Pt. Lena Subdivision (1996)
Subcontractor to R&M Engineering on project for City and Borough of Juneau to complete Planning and Subdivision work for undeveloped city land at Lena Point, Juneau.